Started elevator, the instructions and Evans video are very clear. Note the 2 stainless steel rivets. Different rivet size on end ribs.
10 Feb 2022
Having got the HS absolutely straight proceeded with the elevator skins.
Important notes. There are two floating ribs that need to be inserted the right way around. There are small pieces to strengthen the trim tab hinge. Smaller 6mm rivets are needed just on the right side at the thinnest point.
The elevator composite tip on the right needed to be worked up with extra fibreglass.
Add the trim servo inspection hatch mounting ring inside the elevator before skinning!
Test fit to HS to check hinge alignment and elevator deflection. One hinge is is a bit stiff. Hard to attach on the bench. This will be hard with unsupported HS and Elevator. Deflection seems to be good and within specification in the POH (+30 Degrees). Earlier builders report having to remove some of the HS skin to achieve the required deflection.